Nuclear Industry Yantai Toncin Group Co.,Ltd.

HOME / Complete Equipment & Technology / Control Cabinet
Control Cabinet
It is mainly used in the central control room, underground parking lot and general ventilation lane of low methane gas mines, and is mainly used as DC power supply for the incoming, outgoing, liaison, lighting and wire-laying mineral electric locomotives in the substation low voltage side of the power supply system in main ventilation lane distribution ketone room. This switch cabinet can be used with KYGC mining general high voltage switch cabinet. The high-and-low-voltage inverter soft start, high and low voltage switchgear, industrial ultrasonic cleaner, PLC control cabinet, box substation and other products can be used in such control system integration projects as mine automation (including six major control systems), sewage treatment automation, rubber dam automation and robot system integration etc, among which many technologies have obtained national invention patents and utility model patents.
Control Cabinet

It is mainly used in the central control room, underground parking lot and general ventilation lane of low methane gas mines, and is mainly used as DC power supply for the incoming, outgoing, liaison, lighting and wire-laying mineral electric locomotives in the substation low voltage side of the power supply system in main ventilation lane distribution ketone room. This switch cabinet can be used with KYGC mining general high voltage switch cabinet.

Service Support

Whole Technological Design

Toncin determines reasonable plans and selections by conducting more systematic laboratory tests, semi-industrialization tests and theoretical analysis calculations and adopting appropriate methods in light of the actual problems faced by customers. And it determines specific parameters through laboratory tests and semi-industrial tests.


Project Construction

Toncin can provide customers with integrated project services for its perfect project management system and experienced high-quality team and can also provide customers with its best services in achieving the ultimate project goal by carrying out the management work on the project quality, schedule, safety, cost, procurement, information files, organization and coordination etc. according to customer’s contractual documents. Toncin contracts the design, procurement, construction and trials etc. for the entire process or some certain stages of the construction project according to the contract and takes full liability for the quality, safety, duration and cost etc. of the contracted project.


Response Time and After-sales Services

If any failure due to a defect has occurred during the warranty period, our company has given the following response and promise: to respond within 12 hours and rush to the domestic scene within 72 hours. With a rigorous and efficient service architecture, diverse and flexible service and response means, Toncin is capable of providing response service up to 7* 24 hours to ensure that users can get help at any time during the warranty period.


Specification Parameters

Serial No.

Cabinet Model

Outline Size (W.H.D)

Remark

1

A1

750x1400x400

2

A2

700x1200x350

3

A3

500X750X320

4

B0

900X1800X500

5

B1

750X1700X500

6

B2

700X1600X400

7

B3

650X1300X370

8

B4

650X1400X370

9

C1

450X550X300

Including 50mm lug

10

C2

550X650X300

11

C3

650X750X300

12

D1

750X850X400

Including 50mm lug

13

D2

800X1000X450

14

E1

650X750X250

15

F1

550X700X250

16

G1

1250X850X450

Including 50mm lug

17

G2

1400X1000X500

Product Advantages

The power distribution cabinet is composed of 22 different line schemes and can be flexibly combined.

The main components are products of domestic new technology or products produced by introduced technology, which have strong breaking ability, safety and reliability and are suitable for mine power supply system with rated voltage 660V and 380V.

For user’s needs, some components can be selected as arc-free and maintenance-free devices.

Picture show
Control Cabinet01.jpg
Control Cabinet01.jpg
Control Cabinet02.jpg
Control Cabinet02.jpg
Control Cabinet03.jpg
Control Cabinet03.jpg
Control Cabinet04.jpg
Control Cabinet04.jpg
Control Cabinet05.jpg
Control Cabinet05.jpg
Control Cabinet06.jpg
Control Cabinet06.jpg